Friday, May 19, 2017
Day #7 05/19/17 Last Work Week
Today the structure group finished drilling holes into the ROV to allow for air bubbles to escape while in water. We plan on attaching the tools and figuring out how many pool noodles we need for the ROV next class. The Motors group worked on soldering and waterproofing the motors and plans on finishing the waterproofing by next class. The control box group continued to work on soldering.
Thursday, May 18, 2017
Day #6 05/18/17 Control Box
Tuesday, May 16, 2017
Day #5 05/16/17 Soldering!
Today the structure team assembled the ROV for the first time, we plan on adding all most of the tools and compressing the size of the ROV starting tomorrow. The control box group soldered the fuse holder and began soldering wires to the circuit bored. The tether group stripped and prepared wires for soldering.

Friday, May 12, 2017
Day #4 05/12/17 Beginning the build
Today the motor group finished the propellers and began working on the tether. The structure group finished the measurements for the ROV design and the control box group built a practice circuit board and will begin work on the final control board on Tuesday.
Thursday, May 11, 2017
Day #3 05/11/17 Beginning Our ROV Building
Today the structure design team made a final ROV design and made a multiple diagrams and pictures of the structure including bracket placement and some placement of tools. We plan on figuring out exact measurements next time as well as hopefully beginning actually build the ROV structure. The motor/propulsion group and the control box group practiced soldering today.


Tuesday, May 9, 2017
Day #2 05/09/17 Learning our Roles
Today each of the team members watched their training and safety videos in order to begin building the ROV. We built a rough prototype and worked towards the final design of the ROV.
Friday, May 5, 2017
Day #1 05/05/17 Trying Out ROV's
Today each of the team members tested out the use of the smaller ROV's from last year and also the newer model ROV that Mrs.S Built. We have also finished our preliminary design finished for the ROV with drawings of the design.
Subscribe to:
Posts (Atom)


