Today the structure team assembled the ROV for the first time, we plan on adding all most of the tools and compressing the size of the ROV starting tomorrow. The control box group soldered the fuse holder and began soldering wires to the circuit bored. The tether group stripped and prepared wires for soldering.

No comments:
Post a Comment